Priority Intercommunal Connectivity Program Topographic Control Of The Construction And Development Work Of The Trails Reporting To The Community Of Sidi Zouine Over 7.675 Km - Prefecture Of Marrakech • Construction Of The Track Connecting Provincial Road No. 2011 To The Limit Of Loudaya, Over A Length Of 2.046 Km. • Construction Of The Track Connecting National Road No. 8 To The Kachba Douar, Passing Through The School Annex To The El Khamassa Douar, Over A Length Of 2.906 Km. • Construction Of The Track Connecting The Center Of Sidi Zouine To The El Mamoun Douar, Passing Through The School Annex To The Oulad El Hamria Douar, Over A Length Of 2.723 Km. -