The Purpose Of This Project Is The Renewal Of The Existing Meter Park So That The Apparent Losses Of The System Can Be Reduced And Increasing The Performance Of The Distribution Network. Tied With The Renovation Of The Meter Park, It Is Proposed To Digitize The Tel Rectura Meter Park, To Have A Better Control Of Registered Volumes And Facilitate The Tasks Of Reading And Control Of Flows. As Preliminary Work On The Renewal, It Is Planned To Improve Some Of The Vessels Where They Will Be Installed, With Renewal Of Valves And The Placement Of A Pressure Regulatory Valve In The Pipe Gowns. Otherwise, The Second Mosqueroles Deposit Is Also Waterproofing, As Well As Improving Access With The Formation Of Interior Access Scale, And The Improvement Of Entry And Exit Of The Same Tank.